Material Lab Testing Rates- 2023

 

No

Test

Rates ( Rs. )

1

Sieve Analysis (ABC)

3,300.00

2

Sieve Analysis (Soil)

3,500.00

3

Atterberg Limits Test

4,600.00

4

Moisture Content

1,100.00

5

Field Density

3,600.00

6

Modified Compaction Test

6,500.00

7

Standard Compaction Test

6,100.00

8

California Bearing Ratio Of Soil (CBR)

4,900.00

9

DCP

5,650.00

10

Aggregate Impact Value

3,180.00

11

Loss Angeles Abrasion Value

5,160.00

12

Filakiness Index (Including Sieve Test )

3,200.00

13

Elongation Index (Excluding Sieve Test)

2,800.00

14

Concrete Crushing Value For 3 Cube

1,900.00

For Additional Cube

600.00

15

Rebound Hammer Test

1,800.00

16

Extraction Gradation Asphalt

5,050.00

17

Asphalt Core Cutting ''4''

3,360.00

18

Interlock 01

1,200.00

 

  • Transport Rate For 1 Km- Rs. 115.00
  • All rates above are subject to VAT

 


 

Details of Vehicle & Machinery Hiring Rates 2023 

No

Vehicle / Machine

Rate For Day (Rs.)

Rate for Extra Hour/ Km (Rs.)

1

Road roller (8-10 tons) static (8 hours per Day)

10,000.00

1,250.00

2

Vibrating roller (1 ton) (8 hours per Day)

5,000.00

625.00

3

Wheel Loader (1.7 cu.m) (8 hours per Day)

 

2,875.00

4

Backhoe loader (2 WD) (8 hours per Day)

18,400.00

2,300.00

5

Motor grader (65 HP) (8 hours per Day)

20,000.00

2,500.00

6

Motor grader (120 HP) (8 hours per Day)

30,000.00

3,750.00

7

Tractor (8 ton 0.75 cube:) (8 hours per Day)

2,500.00

312.50

8

Tipper (2.5 ton -01 Cu) (Up to 100Km)

3,000.00

44.00

9

Tipper (3.5 ton -03 Cu) (Up to 100Km)

4,600.00

46.00

10

Water bowser (6000 litres) (8 hours per Day)

10,000.00

100.00

11

Low bed Trailer (30 ton )(Up to 50Km)

10,000.00

230.00

12

Vibrating Roller (10 tons) (8 hours per Day)

20,000.00

2,500.00

13

Vibrating Roller (6-7 tons) (8 hours per Day)

16,000.00

2,000.00

14

Compressor air 175 CFM

7,000.00

875.00

15

PTR- Pneumatic Tyre Roller (8-10 ton) (8 hours per Day)

25,000.00

3,125.00

16

Genareter (4 Kva Light Set) (8 hours per Day)

3,500.00

437.50

17

Asphalt Pever /wheel (8 hours per Day)

45,000.00

5,625.00

18

Plate compecter

3,000.00

375.00

Related Articles

Head Office

Chief Engineering Office

Executive Engineering Office

Contact Us

Address: No:09, Ehelepola Kumarihami Mawatha
Bogambara
Kandy 20000
Sri Lanka
Email: prdacpkd@gmail.com
Phone: +94 812 204378
Fax: +94 812 204977

Who's Online

We have 110 guests and no members online